Building Services Validation
Contents |
[edit] Introduction
The validation of building services is increasingly becoming an essential component of pre-construction packages and tenancy lease agreements. In this article, I intend to explore this fast-growing service and explain the benefits of validation, who benefits from the service and when is the right time to undertake these surveys and inspections.
Building services validation (also known as 'MEP' Validation) can be generally described with 3 C’s, these being-
- Condition,
- Compliance, and
- Capacity.
A report will vary considerably depending on the client and project requirements, but generally the scope of an inspection will include one, or all three of these categories.
A validation report will often be complied with photographic evidence and supporting drawings, notes and test results in accordance with the clients’ requirements. Conclusions will be drawn as to the condition, compliance or capacity of the system/plant with evidence to support the statements within the body of the report, or within the accompanying documents.
[edit] Condition Report
The condition of building services is a common focus of a validation report with a view to advise the client on the level of remedial work that is required to restore an installation to a maintainable condition. This may include advice on the life expectancy of plant, with recommendations for replacement where necessary to aid designers with specifying equipment for refurbishment projects.
Condition reporting should be carried out by competent specialists who can comprehensively test the services and plant against industry standards such as BSRIA, CIBSE and the various electrical regulations. The results should then be scheduled against industry agreed life expectancy guidelines to provide a clear and robust conclusion.
Condition reports are supported by testing the performance of key items of plant, non-destructive testing, and integrity testing amongst many other options to identify possible points of failure. Taking ownership of an installation with unknown faults will likely result in increased maintenance costs and potentially result in significant loss of revenue should failure occur.
[edit] Compliance Report
Compliance reporting is particularly important for clients looking to occupy a space where existing building services are to be retained or altered to suit a new layout or level of occupation. Identifying any non-compliances enables clients to include remedial works into refurbishment contracts and align existing installations with industry regulations.
Key services such as fire detection, emergency lighting, and electrical installations as well as water treatment monitoring are required to be regularly tested to validate insurances and ultimately reduce liability. Compliance inspections may include the verification that an incumbent service provider is adhering to the current requirements for these periodic inspections and maintaining the appropriate documentation, something that should not be taken for granted.
Aside from statutory compliance, validation reports can be used to ensure compliance with performance specifications and original design criteria. Such intrusive inspections range from the measurement of flow rates against design figures for mechanical systems, to reviewing record drawings for an installation, verifying are an accurate representation of the system. This exercise provides huge benefits to Consultants seeking to modify system designs by informing them of the actual site conditions for which they may otherwise have been ambivalent.
[edit] Capacity Report
For clients seeking to extend an existing system, or increase occupation of a space, a key consideration will be the capacity of the building services. Measuring the demand of a system and comparing against the available capacity can provide essential information for future expansion and support budgets/specifications for upgrading supplies or main items of plant.
For example, an increase in the occupation to a typical commercial space will have an impact on the following services (where they are available):
Failing to determine the available capacity of these services will result in costly ramifications post-completion if not identified and addressed at the design stage for the project.
[edit] Risk Management
To ensure risk is managed as effectively as possible, a validation of the building services should be performed as early into the project as possible so that any problems can be identified and incorporated into the specification. For fit out and construction projects, this will be at pre-contract stage after initial conception; where a tenant is seeking to occupy a space, it is advised to carry out intrusive due-diligence inspections prior to signing any lease agreements.
Due to the complex nature of these inspections, it is advised that an independent specialist contractor is engaged to deliver validation reports to ensure an unbiased view of the services, that is compliant with the clients brief. In some cases, incumbent service providers or contractors with an interest in the project are instructed to carry out the inspections and deliver a report, as it would appear to be a cheaper and simpler alternative to an independent specialist. Caution should be applied in such cases as these parties have an interest in the project and may seek to conceal maintenance issues, or condemn otherwise satisfactory systems to inflate the project budget.
[edit] Beneficiaries
The benefits of validation have been recognised by industry experts at all stages of the building services life cycle. Typical industry professionals who save time and money through an increased awareness of building services using validation reports include:
- Design consultancies,
- Project managers,
- Contractors,
- Architects,
- Commercial and retail end users,
- Property consultants,
- Facilities managers,
- High end residential mangers
Jonathan Woodard MIET
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.